Without knowing the piping matl or thickness, it would be imprudent to provide opinion about PWHT.

The flange it is assumed is a SO.  

Certainly it is required to communicate to the inspector for reinspection/restamping.   

 

From: materials-welding@googlegroups.com <materials-welding@googlegroups.com> On Behalf Of Nadakuditi kiran kumar
Sent: 01 October 2019 19:32
To: materials-welding@googlegroups.com
Subject: [SOCIAL NETWORK] [MW:30100] Is PWHT required

 

Dear Gentleman,

We have received two vessels as per drawing. ASME U stamp done on both vessels, there is one bottom outlet nozzle of 6"NB in both vessels. Now client is asking us to remove the flange of the nozzle and hook up with piping. My doubt is 

1. Whether we have to take approval from authorized inspector before going to do any modification.

2. After hook up we have to do PWHT for that hook up joint

Please clarify, if possible please provide code reference.

Line SERVICE not call any PWHT

Construction code for vessel is ASME Sec VIII, Div 1, piping construction code is B 31.3.

 

Thanks in advance,

 

 

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CABQUuFiLcCT5%3DUCLMF4C013RpSb2mPfFMRwcBhLGL%3Dzq21ca_w%40mail.gmail.com.

---------------------------------------------------------------------------------------------------------- Information transmitted by this E-MAIL is intended only for the use of the addressee(s) and contains information that is privileged, confidential or exempt from disclosure under applicable law. If you are not the intended recipient or it appears that this mail has been forwarded to you without proper authority, you are notified that any use or dissemination and or copying of this email in any manner is strictly prohibited and you are requested to delete this e-mail immediately. Communicating through e-mail is not secure and capable of interception and delays. Any one communicating with TATA Consulting Engineers Ltd., and / or its subsidiaries or associates or group companies by e-mail accepts the risks involved and their consequences. While this e-mail has been checked for all known viruses, the addressee should also scan for viruses and notify the originator of e-mail. ---------------------------------------------------------------------------------------------------------

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...