Get in touch with local inspection agency who have AI inspectors and make a contract for acquiring ASME stamping, once this is done, the AAI will guide you through the process of design verification fabrication and inspection stamping - U stamp for your organization. If your company is only fabrication based one, you may have to make a contract for obtaining design verification.
-- Regards,
Kiran
On Friday, March 23, 2018 at 12:47:48 PM UTC+3, Souravbohray wrote:
On Friday, March 23, 2018 at 12:47:48 PM UTC+3, Souravbohray wrote:
Anyone have a u stamp audit experience ?
My company is going to take u stamp for pressure vessel.can any one share a audit procedure and documents require from quality department.
Its very urgent please if anyone have share with me its helpful for me.
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.
No comments:
Post a Comment