Dear Moh.d
You may refer following interpretation:
Ref: ASME SEC-V / Article 2: I-279 repaired area and SE- 1255: A 1.5.17
When RT of repaired area is required, the length of the film used
SHALL be at least equal to the length of original location.
Radiographic re-examination of repair: when repair is performed, it
SHALL be re-examined using same RT technique. Each repair shall be
identified and recorded with R1, R-2, details as required
Of course weld repair shall be repaired by another but qualified
welder for same joint as per WPS and shall followed by RT as mentioned
above.
In some organisations, rejected joint may not be repaired due to
criticality of remote & unmanned / unattended facilities. The option
is both sides of weld joint to be cut and welded. It is specified &
depends upon contractual agreement by owner, if specifically allowed.
Regards
Chandrakant Mohikar (Ex. PDO rtd Co. Site Representative)
On Mon, Jan 4, 2016 at 9:18 PM, Eng.Mahmoud kamel
<mahmoudharb100@hotmail.com> wrote:
>
>
>
> Dear all ,
>
> one joint cut out due to repair in RT and welded again by another welder
> .RT second time mandatory or not .
>
> please need your reply with support code or document from ASME
>
> best regards
> mahmoud
>
> --
> You received this message because you are subscribed to the Google Groups
> "Materials & Welding" group.
> To unsubscribe from this group and stop receiving emails from it, send an
> email to materials-welding+unsubscribe@googlegroups.com.
> To post to this group, send email to materials-welding@googlegroups.com.
> Visit this group at https://groups.google.com/group/materials-welding.
> To view this discussion on the web visit
> https://groups.google.com/d/msgid/materials-welding/BAY180-W7CEAB17B04EE65807FD0B90F20%40phx.gbl.
> For more options, visit https://groups.google.com/d/optout.
--
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAE4dwYPozGJcv0Dva99hHhLb%2BL4%2BXJjsortpGZUOmi9vK4ShMA%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.
Subscribe to:
Post Comments (Atom)
Re: [MW:35289] Welding consumable for S355J2WP material
S355 J2 WP is a weathering structural steel It has better atmospheric corrosion resistance. Use E 8018 - W1/W2 Electrodes This is regular...
-
Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? ...
-
Definition of buttering from ASME Section IX, QW/QB-492 Definitions: Buttering: the addition of material, by welding, on one or bot...
-
Section I. PRINT READING 3-1. GENERAL a. Drawings . Drawing or sketching is a universal language used to convey all necessary information to...