Thursday, December 8, 2011

[MW:13168] Low Hydrogen Electrode in Steel Structure Application

Dear Experts,

Anybody can advice please, when we use low hydrogen type electrode for steel structure welding erection (SMAW process) does it require to be baked all the time @70 C deg on work station?
Is it acceptable when the welder only keep the electrode into the portable oven without baking (after issued from holding oven) although it is a not best practice?
For information, the material of the steel structure is carbon steel Q235.

Appreciate your sharing. Thanks.

Regards,
Endri

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...