[MW:25592] Storage Tanks (API-650) Settlement Reading Range



 

Dear Experts,


I need your option and advice regarding Tank Survey Settlement, As specified in API 650, clause # 7.3.6.5 (2). This clause refers “Observed elevations shall be referred to a permanent bench mark. The level instrument shall be set up at least 1 ½ times tank diameter away from the tank when tank elevation readings are taken”

Practically it looks impossible, if the tank diameter is more than 60 matters. We have 68/72/84 and 106 diameter tanks in our scope of work, I participate with our surveyor team for the settlement survey, if we are  1 ½ times tank diameter away from the tank the reading or result can’t be accurate. Yes if we are near to tank like 20 to 30 meters away from the Tank than found all settlement reading accurate.

Our client insist to maintain the distance according to API 650, clause # 7.3.6.5.even the required distance range is outside the dike wall.

 

Please advise.


Looking forward to you,


Thanks& Regards,

Akmal Malik

Jazan-KSA



 

 


 

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

[MW:36169] Cold Bending Qualification

Dear Experts,  Can anyone share the inspection requirements or a qualification procedure for cold bending? Our client spec states only the requirements for induction bending and would like to know your opinion on the cold bend inspection requirements. The code of construction is B31.3, Max. 5D bends, A106 SS 316L.  Thanks in Advance. -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion visit https://groups.google.com/d/msgid/materials-welding/1be61cc3-e9c9-4a5f-834d-e8485e248432n%40googlegroups.com .

[MW:30043] Weep hole

If weep hole is not provided in dummy pipe before welding What will happen??? -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/da251ee6-fa7f-4851-b876-cdb3834ae341%40googlegroups.com .