Dear All expert

Welding C45 (1045) steel (Pivot Boss) to S275JR (main
structure)

1045 Pivot Boss is casting part.
S275JR is steel plate

For a project I need to weld a C45 (1045 steel, 0.45% carbon Thick 100
mm) on a S275JR steel ( Thichness 30 mm.)

Joint design & condition weld: T-butt joint, double bevel, CJP. Bevel
at S275JR steel.
preheat 110 C
minimum,. interpass temp 220 C max.
by FCAW process.
A5.20 / E71T-1C


After weld, the problem is crack appear along on surface casting
part (1045 steel)

How to solve this problem.

Thank you very much.
leonardd..

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

[MW:34916] Applicability of Impact requirement as per ASME B31.3

Dear All, Design code – ASME B31.3, Welding Code- ASME BPVC SEC IX Material  to be used used during Fabrication - SA 333Gr6 (P No.1 G...