[MW:25316] Post Hydro test welding of Section VIII Div 1 pressure vessels REg.,

Dear All

Can any body suggest code required testing, for the welding done after hydro test.

this welding is done on hydro tested shell,  after hydro test. Code vessels and U Stamping required.

Best Regards
K C R

--
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAL9TLdcUnFv1zzSgYJ82nqzg7L72P3QdihuNtYKLMSJjaOZDXA%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.

No comments:

[MW:34916] Applicability of Impact requirement as per ASME B31.3

Dear All, Design code – ASME B31.3, Welding Code- ASME BPVC SEC IX Material  to be used used during Fabrication - SA 333Gr6 (P No.1 G...