Dear ,
Please find the reply
- Hydrotest requirement (Shop or Site) ITP/PCP .?? Hydrotest carried at Shop as per ITP and project requirement to do at site . And contractor will perform site hydro test .
- In MDR hydrotest pressure or position mentioned.?? Hydro pressure Mentioned .
- Hydrotest Date in Name Plate .?? .dates not mentioned.
- Is it NBIC registered equipment .?? NBIC Registered.
Any further suggestion , advise why it was not stamped @ shop.
Thanks and Regards
Abraham
On Mon, Aug 26, 2019 at 1:23 PM Dhanabal Jalachandran <dhanabal.jalachandrann@gmail.com> wrote:
--Dear Friend,Name Plate and MDR are two very important documents while manufacturing any equipment with ASME requirements.Verify the below points before taking any decision,
- Hydrotest requirement (Shop or Site) ITP/PCP .??
- In MDR hydrotest pressure or position mentioned.??
- Hydrotest Date in Name Plate .??
- Is it NBIC registered equipment .??
BrDhanabal JalachandranOn Sun, Aug 25, 2019 at 2:03 PM Abraham Abi <a.p.abraham2010@gmail.com> wrote:Dear experts--In our project we received Utility Boiler without S Stamp in Name Plate . Contractor response is hydro test will be done with AI involvement and final stamping will be done .But manufacturer supplied MDR documents signed by AI , certified with S stamp mentioning shop hydro test , thk , dimension details all.My query , if MDR is stating S stamp , why it was not stamped in Name plate at shop and delivered to site.Thanks & RegardsAbraham
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAOsuTKndp4%2BW0N%2BtsNJ2cOzdsGswgGJiHLd3wdX0GKWtmEQrZg%40mail.gmail.com.
--RegardsDhanabal Jalachandran
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAPLwtDd-tt2x8ZAR6WdGggPCCouyVWLvVP3J8OetH5LfMH6JWw%40mail.gmail.com.
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAOsuTKkb_RnMR_-J34yietsEL_f-DgsqkxhN7mYUUUW1BT9jZQ%40mail.gmail.com.
No comments:
Post a Comment