Re: [MW:30003] Boiler without S Stamp delivered to site

Dear Abraham,

Thanks for the info,

From your details its understood that, the subjected equipement two hydrotest is involved. In most cases only the Shop Hydrotest is a Inspection stage requirement for Authorized Inspector. Site Inspection stage will come under PID/OID. Based on the Shop hydrotest acceptance AI has cleared the MDR. On acceptance of the 2nd Hydrotest as per project requirement, he may review the report for Name Plate stamping.

To make it clear, if possible directly contact Authorized Inspector to clear further.

Br
Dhanabal Jalachandran

On Tue, Aug 27, 2019 at 10:46 AM Abraham Abi <a.p.abraham2010@gmail.com> wrote:
Dear ,

Please find the reply 
  1. Hydrotest requirement (Shop or Site) ITP/PCP .?? Hydrotest carried at Shop as per ITP and project requirement to do at site . And contractor will perform site hydro test .
  2. In MDR hydrotest pressure or position mentioned.?? Hydro pressure Mentioned .
  3. Hydrotest Date in Name Plate .??  .dates not mentioned.
  4. Is it NBIC registered equipment .?? NBIC Registered.  
Any further suggestion , advise why it was not stamped @ shop.

Thanks and Regards
Abraham


On Mon, Aug 26, 2019 at 1:23 PM Dhanabal Jalachandran <dhanabal.jalachandrann@gmail.com> wrote:
Dear Friend,

Name Plate and MDR are two very important documents while manufacturing any equipment with ASME requirements.

Verify the below points before taking any decision,
  1. Hydrotest requirement (Shop or Site) ITP/PCP .??
  2. In MDR hydrotest pressure or position mentioned.??
  3. Hydrotest Date in Name Plate .??
  4. Is it NBIC registered equipment .??
Br
Dhanabal Jalachandran

On Sun, Aug 25, 2019 at 2:03 PM Abraham Abi <a.p.abraham2010@gmail.com> wrote:
Dear experts 

 In our project we received Utility Boiler without S Stamp in Name Plate . Contractor response is hydro test will be done with AI involvement and final stamping will be done .
 
 But manufacturer supplied MDR documents signed by AI , certified with S stamp mentioning shop hydro test , thk , dimension details all.

 My query , if MDR is stating S stamp , why it was not stamped in Name plate at shop and delivered to site.
 
Thanks & Regards
Abraham 

 

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAOsuTKndp4%2BW0N%2BtsNJ2cOzdsGswgGJiHLd3wdX0GKWtmEQrZg%40mail.gmail.com.


--
Regards
Dhanabal Jalachandran

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAPLwtDd-tt2x8ZAR6WdGggPCCouyVWLvVP3J8OetH5LfMH6JWw%40mail.gmail.com.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAOsuTKkb_RnMR_-J34yietsEL_f-DgsqkxhN7mYUUUW1BT9jZQ%40mail.gmail.com.


--
Regards
Dhanabal Jalachandran

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAPLwtDdF%2BHwwgOBQjd%2BvZRBKS33_-WW-JOD783f54SQzwnWvVQ%40mail.gmail.com.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...