[MW:1145] Piping Materials for Hot water Tracings.


If contract doc. doesn't say and the PMC suggests a diff material, you/your process dept. have to weight the overall cost saving solution and make the decision.
Either to use SS and no inhibitor (or) LTCS with inhibitor.

In case if you are interested to know about tomsol just search in the net for 'Tomsol MSDS' . In case if you are not aware of MSDS, it is the abbreviation of 'Material Safety Data Sheet' which gives more info on the chemical.

With regards,
Kannan



"Bagesh Kumar" <bagesh.kmr@gmail.com>
Sent by: materials-welding@googlegroups.com

18/09/2008 13:13

Please respond to
materials-welding@googlegroups.com

To
"'Desai Jignesh \(Mumbai - Piping\)'" <J.J.Desai@ticb.com>
cc
<materials-welding@googlegroups.com>
Subject
[MW:1144] RE: 1132] Piping Materials for Hot water Tracings.





 
The Contract document does not specify any additive inhibiters in Glycol present, I believe that LTCS Materials can be used but without additive inhibitors the Acid formation will be there which will be highly risky.
 
I think Tomsol A 40 or A 65 additives used as inhibitors element in Glycol to prevent Acid formation. But still not clear about this process data.

Kumar Bagesh



From: Desai Jignesh (Mumbai - Piping) [mailto:J.J.Desai@ticb.com]
Sent:
Thursday, September 18, 2008 7:43 PM
To:
bagesh.kmr@gmail.com
Subject:
FW: 1132] Piping Materials for Hot water Tracings.

 
Bhagesh
 
FYI, we have used LTCS and CS material for Glycol water service in Borouge II project.
Now I do not have process dat with me.
 
Regds/Jignesh --~--~---------~--~----~------------~-------~--~----~
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
-~----------~----~----~----~------~----~------~--~---

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...