Can you please explain why we need separate WPS ? 

On Monday, 28 November 2022 at 20:35:48 UTC+13 Jenish MISTRY wrote:
Yes Definitely for PQR.

But you need Separate WPS ...

On Mon, Nov 28, 2022 at 8:56 AM williams p wilson <william...@gmail.com> wrote:
Dear Experts,

I have a doubt noted below for your advice.


If I used the Steel Designation SA 516 Grade 70  65  60 MTLTV for procedure qualification. I will be qualified for P1 G 1 / 2   To   P1 G 1 / 2
Single PQR / WPS satisfy my below welding requirements. 
(Toughness & PWHT considered)
1) SA 516 Gr.70 to SA 516 Gr.70
2) SA 106 Gr. B to SA 105
3) SA 106 Gr. B to SA 106 Gr. B

Thank You & Regards
Williams P Wilson
QA/QC Engineer
Please consider the environment before printing this message

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-weld...@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAHBxnQ6nEpnmYNSJgSUjNqO%3DM__7SFR4aa3QSfCWWaaQB_yoDw%40mail.gmail.com.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/9c95bfdd-8092-445e-8d48-6f893713779bn%40googlegroups.com.

No comments:

[MW:34920] Tubesheet Hole step

Hello Team, I have one question any tolerance given for tubesheet Hole step. Please do needful. Regards, AP  -- https://materials-...