Dear all,
Need to establish a WPS For a project with PWHT root(full penetration by SMAW)and Subsequent layers by (SAW).
My doubt is I have two seperate WPS for each procedure with PWHT separately.
Can I submit both WPS to client and use them as one procedure on job
1. Root- full penetration joint - SMAW
2. SUB sequent layers - SAW
NO Backgouging will be done.
Root and finish to be UT 100%.
REGARDS,
DATTU.
--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/1fe7d9fd-d244-4aea-ae2d-8bcda3ae1316%40googlegroups.com.
Subscribe to:
Post Comments (Atom)
Re: [MW:35289] Welding consumable for S355J2WP material
S355 J2 WP is a weathering structural steel It has better atmospheric corrosion resistance. Use E 8018 - W1/W2 Electrodes This is regular...
-
Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? ...
-
Definition of buttering from ASME Section IX, QW/QB-492 Definitions: Buttering: the addition of material, by welding, on one or bot...
-
Section I. PRINT READING 3-1. GENERAL a. Drawings . Drawing or sketching is a universal language used to convey all necessary information to...