Re: [SOCIAL NETWORK] Re: [SOCIAL NETWORK] [MW:29874] vertical vessel piping _first rest support

Thank you hemant, I kept the support on pipe rack, deleted the support in vertical. 

On Thu, 18 Jul, 2019, 6:28 AM Hemant W Joshi, <hwjoshi@tce.co.in> wrote:

To shri Chiranjeevi A

Yes I meant that the rest support on the pipe rack may be kept.

 

From: materials-welding@googlegroups.com <materials-welding@googlegroups.com> On Behalf Of Chiranjeevi A
Sent: 17 July 2019 21:58
To: materials-welding@googlegroups.com
Subject: [SOCIAL NETWORK] Re: [SOCIAL NETWORK] [MW:29860] vertical vessel piping _first rest support

 

Dear Hemant,

 

   The horizontal spool length is just 2m and vertical = 3.8m. Hence deleted the support because we have immediate rest support on rack structure. 

  

 

On Wed, Jul 17, 2019 at 5:24 PM Hemant W Joshi <hwjoshi@tce.co.in> wrote:

Do not know if your vertical support consisting of lugs is practically possible without incurring extra supporting costs.

The nozzle loads appear to be quite high.

Morever it is not clear how much is the overall pipe length in the horizontal direction for locating the rest support.  The vertical length of 3.8m has a dead load (empty) of 500 kg. overall considering even the horizontal length dead load . the load does not appear too much .

Hence the rest support looks okay unless it is located beyond the permissible span.

 

From: materials-welding@googlegroups.com <materials-welding@googlegroups.com> On Behalf Of Chiranjeevi A
Sent: 17 July 2019 09:31
To: materials-welding@googlegroups.com
Subject: [SOCIAL NETWORK] [MW:29849] vertical vessel piping _first rest support

 

Dear all,

 

  Please find the below, sulfur absorber vessel, The following pipe mtl is A335 P11 and thk. = 14.27mm. The vertical portion is 3.8m only, immediately on the rack we have rest support

 

   If the vertical portion is long i.e if it about 15m and above, we have to provide rest support either rigid or spring in vertical portion.

 

As per below snap small vertical vessel and the pipe size 12" sch 60 we have more span. Providing support and if not in the vertical portion doesnt impacting the nozzle loads. The nozzle loads are Fx=Fy=Fz=18Tons and Mx=15tons, My=Mz=7tons. In my point of view first rest support is not required in this case, kinldy share your opinions 

 

image.png

 

 

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAN4%2Bm0zTa3T%3DuWCvPQ2WUAYvuXMyOtoo1T3wUJigFZ%3D9h27Q6g%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.

---------------------------------------------------------------------------------------------------------- Information transmitted by this E-MAIL is intended only for the use of the addressee(s) and contains information that is privileged, confidential or exempt from disclosure under applicable law. If you are not the intended recipient or it appears that this mail has been forwarded to you without proper authority, you are notified that any use or dissemination and or copying of this email in any manner is strictly prohibited and you are requested to delete this e-mail immediately. Communicating through e-mail is not secure and capable of interception and delays. Any one communicating with TATA Consulting Engineers Ltd., and / or its subsidiaries or associates or group companies by e-mail accepts the risks involved and their consequences. While this e-mail has been checked for all known viruses, the addressee should also scan for viruses and notify the originator of e-mail. ---------------------------------------------------------------------------------------------------------

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/BMXPR01MB2214EEF1FE1357DDF5C93C70EBC90%40BMXPR01MB2214.INDPRD01.PROD.OUTLOOK.COM.
For more options, visit https://groups.google.com/d/optout.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAN4%2Bm0wwE%2BzdTxMhPj9hTwEfgrD1ZqdC%3D0od-tKXhLDqPX8e6w%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.

---------------------------------------------------------------------------------------------------------- Information transmitted by this E-MAIL is intended only for the use of the addressee(s) and contains information that is privileged, confidential or exempt from disclosure under applicable law. If you are not the intended recipient or it appears that this mail has been forwarded to you without proper authority, you are notified that any use or dissemination and or copying of this email in any manner is strictly prohibited and you are requested to delete this e-mail immediately. Communicating through e-mail is not secure and capable of interception and delays. Any one communicating with TATA Consulting Engineers Ltd., and / or its subsidiaries or associates or group companies by e-mail accepts the risks involved and their consequences. While this e-mail has been checked for all known viruses, the addressee should also scan for viruses and notify the originator of e-mail. ---------------------------------------------------------------------------------------------------------

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/BMXPR01MB2214DFE29AB53C48D37DE991EBC80%40BMXPR01MB2214.INDPRD01.PROD.OUTLOOK.COM.
For more options, visit https://groups.google.com/d/optout.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAN4%2Bm0xgD%2B9ZyUSsH-Js7NLdwM-u8toeRNGUTLwBGxkU9mk9ag%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.

No comments:

[MW:35320] Pipe Insert Sleeve - How to ensure after hydrotest No Water

Dear All, Please see below picture  Pipe Insert Sleeve in my site taking trial and completed hydrotest as proto type. Now how to ensure ther...