[MW:29863] Fwd: vertical vessel piping _first rest support



Dear all

  Please find the below, sulfur absorber vessel, The following pipe mtl is A335 P11 and thk. = 14.27mm. The vertical portion is 3.8m only, immediately on the rack we have rest support

   If the vertical portion is long i.e if it about 15m and above, we have to provide rest support either rigid or spring in vertical portion.

As per below snap small vertical vessel and the pipe size 12" sch 60 we have more span. Providing support and if not in the vertical portion doesnt impacting the nozzle loads. The nozzle loads are Fx=Fy=Fz=18Tons and Mx=15tons, My=Mz=7tons. In my point of view first rest support is not required in this case, kinldy share your opinions 




--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAN4%2Bm0wc%3DqdeBjeGOYLs%3Dy_WSjHhX2Ja7q%2B6yeJ4xSF9F%3DUmCw%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.

No comments:

[MW:35320] Pipe Insert Sleeve - How to ensure after hydrotest No Water

Dear All, Please see below picture  Pipe Insert Sleeve in my site taking trial and completed hydrotest as proto type. Now how to ensure ther...