[MW:5598] Tank Calibration.

We have constructed Oil tank & Fire Water tank as per API 650 & our Project Specification  calls for tank a calibration made in line with the requirements of API  Manual of Petroleum Measurement standard (MPMS).
I need information  about Tank Calibration.
Regards

Bharat B. Gole