Re: FW: [MW:3734] NDT procedure qualification

I agree with Mr.Pradip who has given a very elaborate details.
While demonstrating one thing to be remembered is to perform the demo
on a mock up with known flaws, ie., the fingerprints of the flaws of the
specimen should be available with NDT Level III so that validation of
the technique can be established.

Thanks and regards,
Raghavendra Pemmaraju
ASNT NDT Level III (RT,UT,MT),PCN L-II (UT,Phased Array UT),RSO L-III
(BARC)
Senior Manager,QC
Heavy Engg.Division,
Larsen & Toubro Limited
Hazira Manufacturing Complex
Surat, Gujarat
India

Larsen & Toubro Limited
www.larsentoubro.com

This Email may contain confidential or privileged information for the
intended recipient (s) If you are not the intended recipient, please do
not use or disseminate the information, notify the sender and delete it
from your system.


>>> <pgoswami@sympatico.ca> 25/11/2009 03:59 am >>>



Subject: RE: [MW:3725] NDT procedure qualification
Date: Tue, 24 Nov 2009 14:52:24 -0500
From: pradip.goswami@opg.com
To: pgoswami@sympatico.ca

Dear Hrishi,

Demonstration of NDT procedure is a requirement to ensure that correct
technique is adopted which concurs with the written NDE procedure. Any
NDE procedure has a host of variable, operators training, equipment
calibration, if required NDE mock ups etc. Any of the missing variables
may affect the quality and results of NDE inspection. Hence it is always
advisable to check the correctness of proper NDE technique, prior to
actual NDE on the job.

If you read through ASME Sec-V each NDE technique requires to
satisfactorily establishing prior to application in the job. Usually
this has be ensured by an ASNT Level--II or Level- III personnel or
persons with equivalent NDE qualification.

In ASME Sec-V the following articles talks about demonstration
/qualification: --

* T-221.2 Procedure Demonstration.*Radiography.
* T-721.2 Procedure Qualification*MPI
* T-421.2 Procedure Qualification.-- UT
* T-621.2 Procedure Qualification.--LPI


Hope it answers your query.

Pradip Goswami,P.Eng
Senior Engineer/Specialist(Welding-Metallurgy)
Machine Dynamics & Component Integrity Dept.
Engineering & Training Services Division
ONTARIO POWER GENERATION Inc.
PO Box-2000, RR-55(South)
Nanticoke, Ontario,N0A1L0
Tel:-(519) 587-2201, Ext 3107--in Nanticoke
(416) 231-4111, Ext 5925--in Kipling,Toronto
Fax: (519) 587-6814
Email-pradip.goswami@opg.com.

Date: Tue, 24 Nov 2009 18:21:16 +0530
Subject: [MW:3725] NDT procedure qualification
From: hrishikm07@gmail.com
To: materials-welding@googlegroups.com

Is it mandatory to demonstrate NDT procedure qualification before
applying in the actual job? If so, please give the code/standard
reference.

Regards

Hrishi

--
To post to this group, send email to materials-welding@googlegroups.com

To unsubscribe from this group, send email to
materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at
http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views
and meant for educational purposes only, Users must take their own
decisions w.r.t. applicable code/standard/contract documents.

THIS MESSAGE IS ONLY INTENDED FOR THE USE OF THE INTENDED RECIPIENT(S)
AND MAY CONTAIN INFORMATION THAT IS PRIVILEGED, PROPRIETARY AND/OR
CONFIDENTIAL. If you are not the intended recipient, you are hereby
notified that any review, retransmission, dissemination, distribution,
copying, conversion to hard copy or other use of this communication is
strictly prohibited. If you are not the intended recipient and have
received this message in error, please notify me by return e-mail and
delete this message from your system. Ontario Power Generation Inc.

--
To post to this group, send email to materials-welding@googlegroups.com

To unsubscribe
from this group, send email to
materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at
http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views
and meant for educational purposes only, Users must take their own
decisions w.r.t. applicable code/standard/contract documents.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...