[MW:1962] Diffference between ASMEsection1 and ASMEB31.1 for boiler piping

Hi,All
 
Question 1 : We have boiler piping drawing.It refers two code on one drawing.Note on ISO's are as follows.
ASME Section1/ASMEB31.1 .
So what is the difference between ASME Section 1 and ASMEB31,1?
 
Question 2 Some drawing also shows code break means some portion have ASME SECTON 1 requirement and Other portion have ASME B31.1 requirement.why?
 
Question 3. If both code have different requiremt than How about NDT.Is it same for Both code?
 
Question 4 On one drawing we have Socket weld joint and material is SA106C.Code is ASME section1/ASMEB31,1.will someone tell me what percentage of MT or PT required?
 


--~--~---------~--~----~------------~-------~--~----~
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
-~----------~----~----~----~------~----~------~--~---

No comments:

Re: [MW:35354] Cast-iron welding

1. Preheat joint area(other area, cover with mineral wool). 2. ENiCi or ENiFe-CI. 3. stringer bead. 4. peening is to be done on weldmetal im...