Saturday, April 18, 2009

[MW:1977] Re: Consumable to Weld metal factor

Hi,
I am the Group Purchasing Manager at ESAB Holding - the mother company of all manufacturing companies worldwide.
If anyone is interested in touching base with Engineering at ESAB Gothenburg or with a sales rep to discuss their requirement and get information on our range of consumables and equipment them please feel free to contact me direct on
veraf.khambatta@esab.net

Cheers and keep well
 
Veraf Khambatta
Mobile- +44 7917 479 321



From: babu k <kbabupsg@gmail.com>
To: materials-welding@googlegroups.com
Sent: Thursday, 16 April, 2009 15:32:15
Subject: [MW:1969] Re: Consumable to Weld metal factor

Hi,
 
I am guess that, you need of Productivity Chart , for each consumables
 
It will vary from consumable to consumables , and for different manufacturers; You cannot standardize,
 
You may get this one for ESAB brands , from ESAB Gottemberg on special request.
 
 
Thanks & Regards,
 
K.Babu
Singapore
 
On Wed, Apr 15, 2009 at 2:23 AM, Muhammed Ibrahim <ibratech@gmail.com> wrote:

Gents,
 
I would like to get some information in following matter. Your response will be highly appreciable. I expect an answer from your practical experience. I have checked many manu facturer catalogues. But it does not give perfect proportion.
 
For 1 Kg of weld metal:
 
SMAW- Weld metal to Consumable proportion for Dia 2.5 mm electrode-
 
SMAW- Weld metal to Consumable proportion for Dia 3.2 mm electrode-
 
SMAW- Weld metal to Consumable proportion for Dia 4.0 mm electrode-
 
GTAW- Weld metal to Consumable proportion for Dia 2.5 mm wire-
 
FCAW- Weld metal to Consumable proportion for Dia 1.2 mm wire-
 
SAW- Weld metal to Consumable proportion for Dia 2.5 mm wire-
 
SAW- Weld metal to Consumable proportion for Dia 3.2 mm wire-
 
SAW- Weld metal to Consumable proportion for Dia 4.0 mm wire-
 
CO2 Gas to FCAW wire per Kg -
 
Ar+CO2 Gas to FCAW wire per Kg -
 
Operating factor for SMAW in 8 hr Shift:
 
Operating factor for GTAW in 8 hr Shift:
 
Operating factor for FCAW in 8 hr Shift:
 
Operating factor for SAW in 8 hr Shift:
 
Deposition rate per hour for SMAW  without considering operating factor-
 
Deposition rate per hour for GTAW without considering operating factor-
  
Deposition rate per hour for SAW without considering operating factor-
  
Deposition rate per hour for FCAW without considering operating factor-
  

Thanks & Regards
Muhammed Ibrahim PK





--




--~--~---------~--~----~------------~-------~--~----~
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
-~----------~----~----~----~------~----~------~--~---

No comments:

[MW:34866] Presentation for WPS ,PQR AND WPQ as per ASME Sec IX in power point

Dear Experts.        If anyone having presentation of WPS,PQR and WPQ  as per ASME  SEC.IX  in power point then please share . Regards Sanja...