[MW:1860] Inspection Opening on a vessel.

On a vessel of 1300 dia with a demister pad inside there is a inlet
size of 20"(a process connection) at a comfortable elevation level
below dem pad.To support my stand,can cognisance of UG46(ASME SECT
VIII Div 1) Cl f 5/f 7 be taken and avoid a 20" Manhole on a shell?On
inlet side,we intend providing a small drop-down piping spool which
can be opened when required and connection can be used as an
inspection opening.My contention is to avoid additional too much of
welding heat input associated with provision of a manhole with its
associated RF pad.
Views are invited.
Regards
Aarpee

--~--~---------~--~----~------------~-------~--~----~
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
-~----------~----~----~----~------~----~------~--~---

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...