Tuesday, August 30, 2022

[MW:33416] Re: Procedure for hydrotest of pipeline GRE (UNDERGROUND)


hi, Mr denaouda,

you can refer procedure provided and the last pl contact pipe mfg for final pressure and holding.(i think who is mfg CPI,oman ?)

there is two one test is strength test of 4 hr and second is a leak test of 24 hr at design or 1.1 design.

regards,
Siraj.
On Wednesday, August 3, 2022 at 11:21:29 AM UTC+3 Benaouda Mezrar wrote:
hi expert 

could anyone have a procedure for HYDROTEST pipeline GRE 

thanks



--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/f4a6512d-2387-497b-9704-874cba33778an%40googlegroups.com.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...