Re: [MW:33399] PWHT exemption in ASME B31.3

Just to add one key point: while approaching for the final cap pass, deliberately increase the pre- heat temp to the maximum acceptable range and apply temper bead techniques, so you can keep the last pass hardness under control. 

The above may help to an extent. However, if CVN impact at minus 29 Deg C is applicable. PWHT is only option.

Regards,

On Thu, 25 Aug 2022 at 6:52 PM Sudhakar Kuppuswamy <sudhakarceng@gmail.com> wrote:
Hi,

For Pno 4 (let say P11 grade ),Achieving hardness and toughness without PWHT is really a challenging task. 

Preheat temp and methodology plays a vital role.
Try to use induction heating! 

If the impact test at minus 29 C is required, then there is not point in trying without a PWHT. 

Yes, for the cap pass , temper bead techniques will help greatly . 

In PQR we can do things with lot of care and somehow achieve the required results , but in production each and every joint needs to welded with same care , which may not be easy to do. 

Hence, in my opinion going with PWHT is a good option. Check API RP 582, It mandates. ( I presumed API RP 582 will also be applicable) 

Regards,

On Thu, 25 Aug 2022 at 3:20 PM Anilkumar G <akg.nitt@gmail.com> wrote:
Dear Experts

As per ASME B31.3 table 331.1.3, for alloy steels, PWHT is exempted if thickness <=16mm based on some conditions.



One of the conditions for exemption is the use of multiple layer welds when nominal thickness is greater than 5mm. Whether this condition is to ensure that weld layers are tempered, so that martensitic structure wont be formed? If so what about the final layer of the weld, which would be still left untempered?

Regards
Anilkumar

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/882c4f38-f7f2-4a4b-af0d-6374e93964c5n%40googlegroups.com.
--

Regards,

Sudhakar K CEng MWeldI,IWE.

Welding & Metallurgical Engineer,

Email: sudhakarceng@gmail.com.

--

Regards,

Sudhakar K CEng MWeldI,IWE.

Welding & Metallurgical Engineer,

Email: sudhakarceng@gmail.com.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CABF8NYWr0aEY0CeUMMDcZQG4%2BBuu4HyqgM9Zr%3D%2BSO9VT5Yz%2BHQ%40mail.gmail.com.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

[MW:36169] Cold Bending Qualification

Dear Experts,  Can anyone share the inspection requirements or a qualification procedure for cold bending? Our client spec states only the requirements for induction bending and would like to know your opinion on the cold bend inspection requirements. The code of construction is B31.3, Max. 5D bends, A106 SS 316L.  Thanks in Advance. -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion visit https://groups.google.com/d/msgid/materials-welding/1be61cc3-e9c9-4a5f-834d-e8485e248432n%40googlegroups.com .

[MW:30043] Weep hole

If weep hole is not provided in dummy pipe before welding What will happen??? -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/da251ee6-fa7f-4851-b876-cdb3834ae341%40googlegroups.com .