Re: [MW:11867] Pressurization rate

it is always better to understand the thing to avoid safety issue on bursting of system as systems lack of ductility.so it is applicable you  
reach to working pressure (5 bar / min)   then you have to1 bar / min to be in safe sided till your test pressure reached.

regards

dinesh

On Fri, Jul 22, 2011 at 5:16 PM, Shashank Vagal <nach_sam@yahoo.com> wrote:
Dear members,
In hydrotest, if the pressurization rate is required be increased by the mech crew for some reasons, from 1 bar / min to 5 bar / min, what are the implications?
Best regards,
ShashanK Vagal 

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...