Contractor has missed Preheat reports for 27 joints. As per WPS/PQR preheat required above 170 Centigrade , Material is Alloy P22, A335 (Cr2.25 and Mo 1)

Please share me your experience and suggestion, what action has to be taken to confirm the reliability and integrity of the joints,  if contractor will not find out missed preheat reports
I will wait for your immediately response

Thanks and Best Regards






From: Ali Bhatti <nab_bhatti2000@yahoo.com>
To: Nawab Ali Bhatti <bhattina@sabic.com>
Sent: Tuesday, May 24, 2016 2:34 PM
Subject: Fwd: [MW:24837] Metallurgical affect / defect clarifications



Sent from my iPhone

Begin forwarded message:

From: dilintas@gmail.com
Date: 23 May 2016 at 6:51:02 pm GMT+3
To: 'nawab ali bhatti' via Materials & Welding <materials-welding@googlegroups.com>
Subject: Re: [MW:24837] Metallurgical affect / defect clarifications
Reply-To: materials-welding@googlegroups.com

Forming of non tempered martensite and formation of cracks

Sent from my BlackBerry 10 smartphone.
From: 'nawab ali bhatti' via Materials & Welding
Sent: Παρασκευή, 20 Μαΐου 2016 - 05:37
To: Materials-welding
Subject: [MW:24813] Metallurgical affect / defect clarifications

Dear Experts



We have one project, Material is Alloy P22, A335 (Cr2.25 and Mo 1), Customer requirement 
" where heat treatment of low alloy steel is required the weld joint shall be immediately heat treated without allowing it to cool below 150C (300F). if this is not practical the weld and adjacent pipe shall be uniformly heated to min 300C (570F), kept for 20 minutes , wrapped with insulation allowed to cool and heat treated later"

Please tell me what will be metallurgical affect in weld area if above condition will not follow, only maintain preheat temperature 200C during welding as per WPS/ PQR and conduct the PWHT after one or two days

Best Regards




--
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/936617816.5150279.1463694788989.JavaMail.yahoo%40mail.yahoo.com.
For more options, visit https://groups.google.com/d/optout.

--
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/20160523155102.6713426.4887.3069%40gmail.com.
For more options, visit https://groups.google.com/d/optout.


Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

[MW:30043] Weep hole

If weep hole is not provided in dummy pipe before welding What will happen??? -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/da251ee6-fa7f-4851-b876-cdb3834ae341%40googlegroups.com .

[MW:36169] Cold Bending Qualification

Dear Experts,  Can anyone share the inspection requirements or a qualification procedure for cold bending? Our client spec states only the requirements for induction bending and would like to know your opinion on the cold bend inspection requirements. The code of construction is B31.3, Max. 5D bends, A106 SS 316L.  Thanks in Advance. -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion visit https://groups.google.com/d/msgid/materials-welding/1be61cc3-e9c9-4a5f-834d-e8485e248432n%40googlegroups.com .