Dear Team,

I seek clarification regarding welder qualification requirements under ASME Section IX (2023) in a specific production scenario.

We have a welder qualified for P1 to P1 material using F-Number 43 filler wire (ERNiCrMo-3), qualified via Radiographic Examination (RT). In production, we are welding clad pipes (LTTCS base with Alloy 625 cladding), starting from 6-inch and above, using groove welds only—no weld overlay or buttering is being performed.

My interpretation of QW-383 and other relevant clauses in ASME Section IX (2023) is as follows:

Since the welder is not performing weld overlay (i.e., not welding cladding or depositing corrosion-resistant weld metal), the specific requirements for overlay qualification do not apply.

The welder is executing a full-penetration groove weld between two clad pipes, but not deposited weld metal on the root area as a Weld overlay.

As long as essential variables (for groove welding) are within the qualified ranges P-Number, F-Number, thickness, process, etc.—the welder should be considered qualified for this production weld.

Some colleagues have expressed that the welder must be separately qualified for the GTAW who is doing the root welding & bend test is mandatory for the coupon as per QW-383 requirements, However, in this case, since the welder is not performing weld overlay but is only welding pipe-to-pipe joints with full penetration, I believe the overlay qualification is not applicable. Moreover, in weld overlay qualifications, backing is typically used, and deletion of backing is an essential variable. In our case, we are not relying on the cladding as backing, nor is the welder depositing metal onto the cladding, so overlay qualification logic does not extend here.

Therefore, my conclusion is that the welder, being qualified for P1 to P1 with F-43 filler wire and RT, is suitably qualified to perform these groove welds between clad pipes, provided all essential variables remain within the qualified ranges.

I would appreciate your expert feedback on this interpretation. Please correct me if there are any overlooked aspects or interpretations.



--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/materials-welding/CAJ90KGRfKBTdAdy9nSTV1Qt2FzBzYBDWvYccBUEbeTegYeSBtg%40mail.gmail.com.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

[MW:36169] Cold Bending Qualification

Dear Experts,  Can anyone share the inspection requirements or a qualification procedure for cold bending? Our client spec states only the requirements for induction bending and would like to know your opinion on the cold bend inspection requirements. The code of construction is B31.3, Max. 5D bends, A106 SS 316L.  Thanks in Advance. -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion visit https://groups.google.com/d/msgid/materials-welding/1be61cc3-e9c9-4a5f-834d-e8485e248432n%40googlegroups.com .

[MW:30043] Weep hole

If weep hole is not provided in dummy pipe before welding What will happen??? -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/da251ee6-fa7f-4851-b876-cdb3834ae341%40googlegroups.com .