Thursday, February 13, 2025

[MW:35414] Nozzles/ offset/ pipe

Dear experts,

The distance between two nozzles 4 Meters , as per requirement connected pipe must be in straight for free flow of carbon where as bottom nozzle shifted around 70mm . ( Both nozzle not in line)
Pls advise, what is angle is suitable for free flow of carbon black powder and which location is suitable for making offset in pipe.

Any reference standard pls guide 

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/materials-welding/CABHGzEX9JhW0zptOrDnuKAyv0XXbm-EvbFFyDfq3dhnU1FRi1Q%40mail.gmail.com.

No comments:

Re: [MW:35686] HDPE WPS

Refer ASME SEC IX  There is separate chapter for Plastic welding . Based on that you have to prepare  Sent from my iPhone On 21 Jun 2025, at...