Re: [MW:34933] ASME SEC VIII Div1- UG-36 & UG-42 Nozzles RF pad requirements & mulitiple Nozzles opening

Dear,

Let's address each query with detail:

  1. 6" nozzles required RF pad or not? According to the ASME Boiler and Pressure Vessel Code, Section VIII, Division 1, specifically in UG-36, when the thickness of the vessel wall exceeds 10 mm (or 0.394 inches), reinforcement pads are typically required for nozzles larger than 2 3/8" ID. However, there are exceptions based on specific design considerations and loadings.

    In the case of the vessels you mentioned, if the thickness of the vessel wall where the 6" nozzles are located exceeds 10 mm, then RF pads may be required. The decision to use RF pads depends on factors such as the design pressure, vessel material, service conditions, and nozzle loads. RF pads help distribute the stresses and loads at the nozzle-to-vessel junction, enhancing the structural integrity of the vessel.

    Engineers and fabricators need to conduct detailed stress analysis and consider factors like nozzle loads, internal and external pressures, thermal effects, and the mechanical properties of the vessel material to determine whether RF pads are necessary. Additionally, industry standards and codes may provide further guidance specific to the application.

  2. 6" nozzles in-between 2" nozzles with maintaining 500mm center-to-center distance - minimum distance requirements: Maintaining adequate spacing between nozzles is crucial to ensure proper operation, maintenance access, and structural integrity of the vessel. The minimum distance between two nozzles depends on various factors, including vessel design, nozzle size, nozzle type, and applicable codes and standards.

    In the scenario you described, where 6" nozzles are positioned between 2" nozzles with a specified center-to-center distance of 500 mm, it's essential to confirm whether this distance meets the minimum requirements outlined in the relevant design codes and standards, such as ASME BPVC Section VIII, Division 1.

    Typically, the minimum distance between two nozzles is determined to prevent interference, facilitate maintenance activities, and ensure proper reinforcement of the vessel walls around each nozzle. Factors such as the diameter and orientation of the nozzles, nozzle loads, and vessel geometry influence the minimum spacing requirements.

    Engineers and designers should refer to the applicable design codes, conduct stress analyses, and consider specific project requirements to determine the suitable spacing between the 6" and 2" nozzles. If the specified center-to-center distance of 500 mm meets or exceeds the minimum requirements specified in the applicable codes and standards, it should be acceptable. However, it's crucial to verify this through thorough engineering analysis and review.

Regards,

Amol K.B

On Mon, 29 Apr 2024 at 18:55, Ponnikumar <k.ponni1994@gmail.com> wrote:
Dear all,
Kindly refer to the attached images of the 
2 instrument air vessels.
one vessel 6" nozzles with reinforcement pad and other one same 6" nozzles without RF pad. Top head diameter, design pressure, head thickness , nozzle to head weld is internal portrusion with back side welding also same

From UG-36 above 10mm thickness only 2.3/8" ID nozzles can fabricate with out reinforcement pad.

Queries:
1. 6" nozzles required RF pad or not? With details explain 
2. 6" nozzles in-between 2" nozzles with maintain 500mm centre to distance - min distance requirements.


--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAKL%3DdYwuPbWBjMbyfZcbS4De_tJ23EVbs4KSNcy%3Du8q8p7Wi2w%40mail.gmail.com.


--
Best regards,

Amol K.B
B.E(Mech), CSWIP 3.2.2, NACE CIP 1 & ASNT LII(4M)

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAADcG1pFQ6r4uBRKyAv1CT9AoqeKY%3DnyRxkryRad60eTsjpb3A%40mail.gmail.com.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...