Thursday, March 14, 2024

[MW:34808] P3-P4 MATERIAL WELDING

Dear Gents,

I have to prepare a PQR as per below requirement:



Capture.JPG

Required your support for the selection of filler wire. The job is to cut header cap for inspection and weld it back for convection section.

As per my research we have selected ER-80S-B2 FOR ROOT AND CAPPING and E 8018-B2 for FILL UP and CAPPING.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/c09c9a01-8b7e-4bb4-9c88-c8cb14a9ad4dn%40googlegroups.com.

No comments:

Re: [MW:35354] Cast-iron welding

1. Preheat joint area(other area, cover with mineral wool). 2. ENiCi or ENiFe-CI. 3. stringer bead. 4. peening is to be done on weldmetal im...