Please Qualify a New PQR's, as per your given information PQR's Qualify in,
Minimum PWHT Cycle:
Temp. 610°C
Time : Soaking Time 55 Minutes
Other : Rate of Heating 205°C/hr.
 Rate of Cooling 180°C/hr.
Maximum PWHT Cycle:
Temp. 610°C
Time : Soaking Time 165 Minutes or 600 Minutes**
Other : Rate of Heating 205°C/hr.
 Rate of Cooling 180°C/hr.

All testing, including tensile, bend, hardness, and impact tests, shall be conducted after both Minimum PWHT and Maximum PWHT. The size and dimensions of the test coupons will be determined according to testing requirements and coordinated with the testing laboratory.

(**Note: The duration of 600 minutes was chosen because it provides a comprehensive solution for potential future requirements, including simulations involving 6-7 PWHT cycles for other clients.)

On Saturday 30 December 2023 at 17:10:52 UTC+5:30 Aniruddh Chaudhary wrote:
Dear Sir's,

can you please explain for the blow how i can resolve the client comments: 

Client comments on PQR:

"All PQR's shall be qualified with simulation Heat Treatment  with minimum of 3 PWHT Cycles and the applicable testings also to be done on the both minimum and maximum  PWHT Condition"

PQR done as below:

Temp. 610°C
Time : Soaking Time 55 Minutes
Other : Rate of Heating 205°C/hr.
 Rate of Cooling 180°C/hr.

Regards,

AK chaudhary. 

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/f45f3330-64f3-42b3-939a-7ea813c93589n%40googlegroups.com.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...