Sunday, February 25, 2018

[MW:27377] Preheating requirements

Its required because of high thickness also.
Basically its done for maintain before and inprocess stages welding temprature and to increase weldability .
For carbon steel preheat is required for high thickness and for alloy steel its mainly required for both low and high thickness.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
Visit this group at https://groups.google.com/group/materials-welding.
For more options, visit https://groups.google.com/d/optout.

No comments:

Re: [MW:35686] HDPE WPS

Refer ASME SEC IX  There is separate chapter for Plastic welding . Based on that you have to prepare  Sent from my iPhone On 21 Jun 2025, at...