Re: [MW:5925] GMAW


GMAW-S Short Circuiting Process is most used for Root Pass,Reason being
Molten weld puddle is able to freeze more quickly than welding with a continuous arc & less voltage required.


ASME Section IX applied special variables when the GMAW-S process is used. When qualifying a welding procedure, the variable QW-403.10 limits the base metal thickness qualified to a maximum of 1.1 times the test coupon thickness for procedure qualification test coupons less than l/2 inch thick. The variable QW-404.32 also limits the deposited weld metal thickness range to a maximum of 1.1 times the deposited thickness of the procedure qualification test coupon for deposits less than 1/2 inch thick.

It can be used for P1 group materials













Hello All


As Per ASME Sec VIII div.1,  which GMAW  we can use for root pass

for  "P1" group materials and    what is   min  < t < max ?.

Thanks




--
>
To post to this group, send email to materials-welding@googlegroups.com
>
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
>
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
>
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
>

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

[MW:34920] Tubesheet Hole step

Hello Team, I have one question any tolerance given for tubesheet Hole step. Please do needful. Regards, AP  -- https://materials-...