Hi

We had faced this concern couple of times in our previous projects. Yes base material will lose strength when u apply such heat treatments. Best solution for this is to order plate directly from mill with end finish requirements (such as double normalising + SPWHT, if any). 
If u aren't able to approach mills check for available plates having tensile on the higher side, test it with simulation of double normalising. If the results satisfactory then you may utilise the plates for forming. 

Client requirements overrule the code requirements hence you have to comply and cannot take relaxation on it based on code.

If the dished end manufacture wants to perform intermediate normalising then it cannot be considered as normalising after forming. Hence client requirement of normalising after forming requires to be performed separately. 

If the dished end has long seam then ensure your PQR is qualified with double normalising or single normalising with aggregate time for both cycles (check specs of client if it is accepted, sometime client will specify that it has to be performed separately). 

During double normalising weld will lose its strength exorbitantly, hence to achieve required minimum strength you have to utilise consumables with higher strength. 
Consult consumable suppliers they will be able to assist you with right consumables. 

Hope you are clear now.

Sent from my iPhone

On Aug 30, 2019, at 10:46, 'Prakash Hegde' via Materials & Welding <materials-welding@googlegroups.com> wrote:

Hi!
With multiple normalising.UTS gets deteoriates
Accordingly  ddelivery condition.of.plate.you req UTS on higher side than min requirement
Ii) Generaly for highet.thick weld.seam multiple Normalising.ll.reduce UTS as such Normalising criteria.is not.addressed in.Sec IX.or.Div 1 of ASME
THATS why most of the designer recomend Crown.n Petal.for higher thk.Dends
Regards
Hegde


On Fri, 30 Aug 2019 at 11:51, Jayesh Parekh
In our recent project i encounter one problem.

Material Grade : SA-516 Gr.70 Supply condition : Normalized
Dished end : Ellipsodial
Thickness : 45 mm
Forming process : Cold forming
Dished end have one cordal seam
Impact required at : -46 deg. C
so during cold forming vendor need one intermediate normalizing. and as per client requirement one more normalizing performed after complete dished end forming. So, total 2 time normalizing have to perform.

So, my question is ; 
(1) During plate order i have to take 2 normalizing cycle simulation ? Yes Or No? With Reason
(2) May I take benefit of Clause UCS-85 (i) of ASME sec-8 Div.1?
(3) Is same clause applicable for welding?
(4) And If i will perform double normalizing then I have to simply double the normalizing time or 2 separate normalizing i have to perform?
(5) What will be effect on weld and base material after 2 time Normalizing?
(6) if any one encountered such issues . please help to solve 

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/f9744a58-4c34-4c96-93f8-ff304e519db5%40googlegroups.com.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/177254843.162832.1567147604899%40mail.yahoo.com.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...