Skip to main content

[MW:706] NECOR 2008

FYI pl.


From: hasan [mailto:hasan@igcar.gov.in]
Sent: Wednesday, March 26, 2008 5:49 PM
To: Bathula Raghuram (Mumbai - PIPING)
Subject: NECOR 2008

 

Dear Raghuram Bathula,

 

The Indian Society for Non-Destructive Testing (ISNT), Kalpakkam Chapter, is organising a two day Workshop on ‘Non-Destructive Evaluation of Corrosion’ during 10 and 11 May, 2008, at Hotel Radha Park Inn, Arumbakkam, Chennai. The Workshop is intended to be an intensive orientation course for engineers, designers, executives, managers, students and faculty of engineering colleges in application of non-destructive testing techniques for detection and evaluation of corrosion. I am enclosing a brochure for your perusal.

 

Corrosion poses serious problems to the safe and economic operation of a wide variety of industrial installations. Today, corrosion management has become the order of the day in major industries to scientifically tackle corrosion. Non-Destructive Evaluation (NDE) through off-line and on-line techniques has become necessary for better corrosion management. NDE of corrosion would contribute significantly in planning the maintenance schedules of components besides development of risk assessment strategies and integrity management programs. Hence, it is essential for engineering professionals to update their knowledge on the corrosion behaviour of materials and its NDE.

 

The subject content of NECOR 2008 has been drawn up to address the above issues. Eminent speakers from the industries and research institutions will deliver lectures on 17 topics which include radiographic, ultrasonic, eddy current, acoustic emission, magnetic, laser, thermal and electrochemical methods for corrosion monitoring, corrosion detection and evaluation in nuclear systems, thermal power plants, chemical and petrochemical plants, cathodic and anodic protection systems, concrete structures and in buried pipelines, automation and robotics for corrosion monitoring, life prediction and extension methodologies for corroding systems.

 

I am writing this letter to request you to nominate delegates from your organisation in large numbers to NECOR 2008. I am sure the delegates would benefit immensely by attending NECOR 2008. I also invite you to advertise in the Proceedings of NECOR 2008 and/or be a sponsor of the Workshop.

 

I also request you to give wide publicity to this Workshop amongst your contacts.

 

Thanking you and with warm regards

 

Yours sincerely

 

 

(HASAN SHAIKH)

Convener

NECOR-2008

 


--~--~---------~--~----~------------~-------~--~----~
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
-~----------~----~----~----~------~----~------~--~---

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

[MW:36169] Cold Bending Qualification

Dear Experts,  Can anyone share the inspection requirements or a qualification procedure for cold bending? Our client spec states only the requirements for induction bending and would like to know your opinion on the cold bend inspection requirements. The code of construction is B31.3, Max. 5D bends, A106 SS 316L.  Thanks in Advance. -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion visit https://groups.google.com/d/msgid/materials-welding/1be61cc3-e9c9-4a5f-834d-e8485e248432n%40googlegroups.com .

[MW:30043] Weep hole

If weep hole is not provided in dummy pipe before welding What will happen??? -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/da251ee6-fa7f-4851-b876-cdb3834ae341%40googlegroups.com .