Re: [MW:5967] ASME AUDIT

I would add to ask the NDT company to make available his written practice according to SN-TC-1A edition referenced in the code and also the Level III and Level II personnel qualifications

Dr. G. Dilintas - Authorized Inspector Supervisor of OneBeacon AIC
I&F Regional Technical Manager
Bureau Veritas Piraeus - Greece
Tel: +30 210 40 63 113/4
Fax: +30 210 40 63 118
Cell: +30 69 44 64 62 04
Inactive hide details for Karthik <karthik6684@yahoo.com>Karthik <karthik6684@yahoo.com>


          Karthik <karthik6684@yahoo.com>
          Sent by: materials-welding@googlegroups.com

          13/07/2010 05:11

          Please respond to
          materials-welding@googlegroups.com

To

materials-welding@googlegroups.com

cc


Subject

Re: [MW:5962] ASME AUDIT

Ref

Hi Andrews,
pls.find below some additional points added .
Thanks for your reply.Regarding ASME renewal,I have a lot of experience on this and i want to know about your company is in which stage? means..when will your certificate expires? what are all the preparations you have done so far? you have start processings of renewal atleast 6 months before of expire date.please find below the shortlist of the renewal process.

1.Make a contract renewal of AIA (Authorised Inpection Agency) of ASME (Lloyds....ABS..etc..) and mak.e scedule with them
2.Fill the application form and get signature of AI and send to ASME and National Board with appropriate fees
3.Order the Code Books as applicable to your stamps.
4.Make a contract with NDE company and ask them to prepare NDE Procedures.Those NDE procedures shall be demonstrated to AI and get acceptance from him.
5.Preparation of Documents
a)Quality manual and procedures and get acceptance from AI
b)Design and drawing of Demonstartion vessel get acceptance from AI
c)prepare a team for ASME Audit(Design Manager,Design Engineer,QC manager,QC Engineer,QC Inspector,Production Engineer,Production Foreman,Fitters,Welding foreman,welders)
d)Preparation of WPS,PQR and Welder Qualification (If the existing WPS,PQR,WQT suitable for your demo vessel...just submit to AI for acceptance)
e)ITP,Weldmap etc.,
6.Train the welders and qc inspectors to follow ASME Quality manual,WPS,PQR,WQT and the welders shall answer at the time of final and pre audit about their qualification ,selection of filler metals,maintenance of filler metals..etc.,
7.train the material controller about receiving of incoming materials,transfer of marking,coded marking,filler metals drying and baking control with log book etc.,
8.Fabrication of Demo vessel with oneside head without weld and one nozzle to head or shell without weld to access the AI and ASME designee to inspect and witness the nozzle weld at the time of final audit.


The above mentioned points are preliminary important points and others can be done during renewal process.

If you have any quiries pls.feel free to contact me.

Thanks & Regards,

(Karthik)


Karthikeyan.S

Getabec Energy Co.,Ltd.
379,Moo6,Soi8,Nikhomphatana,
Rayong-21180,
Thailand.
Phone: 0066 38 897035-8 (Off)
Fax: 0066 38 897034
Hand Phone: 0066 892512282


--- On
Tue, 7/13/10, James cyrilandrew <jcyrilandrew@gmail.com> wrote:

From: James cyrilandrew <jcyrilandrew@gmail.com>
Subject: [MW:5960] ASME AUDIT
To: "Material welding groups" <materials-welding@googlegroups.com>
Date: Tuesday, July 13, 2010, 1:29 AM


Hello,

Anybody having experience in asme audit. could u plz share with me. expecting some guidence.
--

Regards,
J.C.Andrews
QA/QC Engineer
Doha-Qatar.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at
http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at
http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.