Re: [MW:32892] Procedure need for reinforcing pad

hi Bro,
you can able to separate into two parts and it would be more easier for fab. method and meet code requirement.
thanks

Best regards,
Vu Duc Thuan 
M.Phone: (+84) 983017936
Email: dthuan117@gmail.com

VĆ o ngĆ y 17 thg 2, 2022, lĆŗc 18:36, Ghanshyam Shukla <gsshukla5@gmail.com> đã viįŗæt:


Dear Mr. Pandiyan

please  refer below attachment

On Thu, Feb 17, 2022 at 4:17 PM Maruthu Pandian <maruthupandian0895@gmail.com> wrote:
Dear all

         I have one Doubt regarding the reinforcement pad which is designed by B31.3. I get all the clearances from the design team. But I just wonder if the pad will be cut by two pieces lateral to run pipe and merged on the location. 

          My Client told me that the case is code wise ok. 

          So now I have to Submit my WMS for that work.

          In B31.3 there is nothing about it. So please generals if you have any about that ... Please share with me.

Herewith I attached the Photo also



<WhatsApp Image 2022-02-17 at 10.53.43 AM.jpeg>

--


==============
Thanks & Regards

SUNGDO ENGINEERING 
MARUTHU PANDIAN.N
Engineer (Piping & Quality Control)
Polimery Police PDH/PP Project, Poland
Mob +48571461164

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAJ3bEeXbpLZnKVLYEwH0NpKkP6Het6i6raC2EwEHSBYg_049Kg%40mail.gmail.com.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAHwwqE9X%3DqxyfsOB1YCZwSkMPM1_3K9FiL1q5RCK-MjMZdbRdw%40mail.gmail.com.
<Pad.pdf>

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...