Tuesday, January 4, 2022

[MW:32730] Heat treatment cycle preparation

Hello everyone,
using ASME B31P Standard Heat Treatment for Fabrication Process, How i prepare my heat treatment cycle? Table 6.1.1-1 is showing soaking temperature and time, where i can find loading, unloading temperature, rate of heating and cooling?, and how i decide how many cycle is required?

Regards,
Shahil Saini,
PGET- Welding Engineer

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CALfBO_-yiDFXSOKJnsH6sykfAbUqa27Z09seuiQr6nxD0d-Syw%40mail.gmail.com.

No comments:

Re: [MW:35289] Welding consumable for S355J2WP material

S355 J2 WP  is a weathering structural steel  It has better atmospheric corrosion resistance. Use E 8018 - W1/W2  Electrodes This is regular...