It is quite common in the line pipe manufacturing industry. It is an automatic GMAW welding process equipped with mostly 1000A DC capacity power sources with CV mode. This power sources can be used for both GMAW/SAW automatic welding process and SAW pipe seams made with tack welds, the melting and coalescence of the tack weld into the final weld seam shall be verified by macrographic testing as required in the API 5L or ASTM specifications. Some manufacturer may remove the tack welds by grinding or machining after the Inside welding on the pipe which is also allowed as per API 5L(Refer Tack welds Clause 8.4 of API 5L).

Higher the pipe thickness, higher the wire diameter. I have used upto 4.8mm dia GMAW wire for 45mm thick line pipes with more than 1000A current for GMAW Tack welds.

The diameter 4mm and above are non standard size wires still it is available based on customer request(Refer ASME II C SFA 5.02M). So this diameter may not be indicated in the common datasheets/Specifications.

On Sun, Jun 7, 2026 at 12:34 PM Nambirajan Avudaiappan <nambirajanavudaiappan@gmail.com> wrote:

Dear Experts,

During my review of the WPS, I noted that a 4 mm GMAW wire has been specified. However, this wire size is not listed in the manufacturer’s technical datasheet available on their website. Although the vendor has submitted the wire MTC, there appears to be a discrepancy between the documented specifications and the datasheet.

Additionally, I am surprised to observe that welding has reportedly been carried out at a current of 900 amps using this wire. I would appreciate your clarification on the feasibility and justification of this parameter, as it seems unusually high for GMAW applications.

Kindly provide your technical inputs and supporting references for the above points.

Best regards,
Nambi

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/materials-welding/CAJuyB2UHi13C3OS7mrKVWStL5NMR1%2Bv-dxSAU8--FSK83X8z-A%40mail.gmail.com.


--
With Regards
Surendar Gunasekaran
+91-8883591861.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/materials-welding/CAA2aRGqo_eQLfAAihS6p%2Bf_PdtFkVE3%2B2wfi8SdzBBafM8M%3DSQ%40mail.gmail.com.

Comments

Popular posts from this blog

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

[MW:5202] RE: 5200] NDT after PWHT

------------------------------------- Interpretation:  I‑89‑14 Subject:         Section I (1986 Edition, 1987 Addenda), PW‑11,                  NDE Prior to PWHT Date Issued:     December 15, 1988 File:            BC88‑393   Question: Does PW‑11 require that NDE be performed on welds after they have been subjected to the postweld heat treatment required by PW‑39?   Reply: No, unless the conditions described in PW‑11.2.2 exist. ---------------------------------------------- Interpretation:  VIII-1-98-09 Subject:         Section VIII, Division 1 (1995 Edition, 1996 Addenda); NDE                 ...

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...