[MW:36088] Request for Technical Opinion – Leakage in SS 316L Schedule 10S Line After 4 Months of Service
Dear All,
We would appreciate your technical opinion regarding a leakage issue observed in stainless steel piping after several months of operation.
Background:
- Line sizes: 2" and 6" 361L Stainless Steel (Schedule 10S)
- NDT coverage: 10% completed as per project requirements
- Hydrostatic test: Successfully passed without any leakage
- Records related to line preservation after reinstatement are not available, as the system was under the control of the Pre-Commissioning and Commissioning teams
- The line has been in service for approximately 4 months
Issue:
Leakage has recently been observed at several locations, including:
- Weld joints
- Pipe body/base material
Considering that the line successfully passed hydrotesting and has been operating for several months before the leakage occurred ,
Could you please share your views on the potential reasons
Thank you in advance for your valuable inputs.
Best Regards,
Karuppasamy
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/materials-welding/CAJg1Szkrj653Rm7mW0GT2rjsedFdY2wSXxXr5uKQHAAgMxeTMg%40mail.gmail.com.
Comments