Use the PQR if:

The PQR includes Inconel 625 overlay testing (chemical composition, corrosion resistance) on P1.

The job's weld is primarily between Inconel 625 overlays.

All essential variables (welding process, thickness, etc.) are within the PQR's qualified range.

You confirm compliance with the project's code and client requirements.

 

Do not use the PQR if:

The job involves significant base metal welding (P1-to-P1) beyond the overlay, as QW-424.2 may not apply.

The PQR lacks overlay-specific tests or data for Inconel 625.

The project requires a P1-to-P1 PQR.

 

Final Guidance

Draft the WPS: Base it on the PQR, ensuring compliance with QW-424.2 and job requirements.

Consider a New PQR: If the PQR doesn't meet all conditions or project requirements, qualify a new PQR for 

P1 + Inconel 625 to P1 + Inconel 625 to ensure compliance.


C Sridhar.


On Sat, 2 Aug 2025 at 15:41, 'Birupakhya Sahu' via Materials & Welding <materials-welding@googlegroups.com> wrote:

QW-424.2

For welds joining base metals to weld metal buildup or corrosion-resistant weld metal overlay, the buildup or overlay portion of the joint may be substituted

in the test coupon by any P-Number base material that nominally matches the chemical analysis of the buildup or overlay.

With respect to the above clause, Can we approve the following condition.

PQR : P1+ inconel 625 WOL(PWHT) TO P43

Job : P1+Inconel 625 to P1+Inconel 625

Can we use this PQR to weld the Job preparing a WPS accordingly.

Can any one suggest please.

 

Regards

Birupakhya




________________________________________________________________________________________________________________________________
This email may contain confidential and/or privileged information. If you are not the intended recipient (or have received this email in error) please notify the sender immediately and destroy this email. Any unauthorized copying, disclosure or distribution of the information in this email is strictly forbidden.
________________________________________________________________________________________________________________________________

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/materials-welding/15608E81BA54485586DF9090A788C14E%40temaindia.com.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/materials-welding/CAHo%3DYihnsdsA47k39Cf8MvfxST76tAhmHu0s634baBsAV74rwA%40mail.gmail.com.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

[MW:36169] Cold Bending Qualification

Dear Experts,  Can anyone share the inspection requirements or a qualification procedure for cold bending? Our client spec states only the requirements for induction bending and would like to know your opinion on the cold bend inspection requirements. The code of construction is B31.3, Max. 5D bends, A106 SS 316L.  Thanks in Advance. -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion visit https://groups.google.com/d/msgid/materials-welding/1be61cc3-e9c9-4a5f-834d-e8485e248432n%40googlegroups.com .

[MW:30043] Weep hole

If weep hole is not provided in dummy pipe before welding What will happen??? -- https://materials-welding.blogspot.com/ https://www.linkedin.com/groups/122787 --- You received this message because you are subscribed to the Google Groups "Materials & Welding" group. To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com . To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/da251ee6-fa7f-4851-b876-cdb3834ae341%40googlegroups.com .