Re: [MW:33454] Tube to tube sheet WPS qualification

Dear sujit
If your code of construction is asme sec8 div1 no need of mockup you can use groove weld qualified wps for tuve to tubesheet
If code of construction is asme sec8 div2 its mandatory to do mockup.
If you have any earlier qualified tube to tubesheet mockup you can use by providing essential variable for tube to rubesheet in sec9



On Thu, 8 Sept 2022, 1:51 pm sujit kumar, <sujitkumar19942@gmail.com> wrote:
Hello sahil saini sir.

I would like to inform you that I know that clause but there is so many dought i am getting like 
If I want to do welding flange to tube....how to prepare WPS for that..???
Is there demonstration required for this tube to tube sheet...??

What test required in that WPS??

Please explain me it would be greatful  for me 

Best Regards
Sujit kumar


On Thu, Sep 8, 2022, 10:43 Shahil Saini <sainishahil98@gmail.com> wrote:
 Hello Sujit,

You shall refer ASME section IX Article-1 (QW-193) for tube to Tubesheet tests.

Thanks & Regards
Shahil Saini 

On Thu, Sep 8, 2022, 08:29 sujit kumar <sujitkumar19942@gmail.com> wrote:
Dear all,

Greeting for the day.

Please guide me regarding tube to tube sheet WPS Qualification.

We are having 8'' and 20'' flange and
 tube size 12mm Od 
thickness of the tube is 0.9 mm


Best regards
Sujit kumar

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAFonYWMNorSJkBUKcBAS3_iwzbejVXnY0sSFL33yk4yxD7k46w%40mail.gmail.com.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CALfBO_8TFOFdwzb0VNs5v7HUkP7rGEAxgdG%2B8ktVovAgLxZKxA%40mail.gmail.com.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAFonYWPkyV81QcDBOohZBnM_-ydBRAw7k1mjDm4Z6ZKEoYksDQ%40mail.gmail.com.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAOWr6k_%3DfX15DzkcyNX4jXT6%2Bb2Zt3r%3D%3DZnt%3DEgUyg8bboV3SQ%40mail.gmail.com.

Comments

Popular posts from this blog

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...