Hi! You require to qualify for each joint configuration separately Regards Hegde P.b On Tuesday, 29 April 2014 6:27 PM, Materials & Welding <materials-welding@googlegroups.com> wrote: In fabrication drawing, Tube to tubesheet joint with 4mm projection. in the Mock-up/PQR, vendor kept 0.5mm projection, but fused the tube with the tubesheet. Is vendor to provide mock-up with 4mm projection, or change only the WPS to show 4mm projection in the joint, with the same PQR. as per QW 288 this is not an essential variable, hence in my opinion revision of WPS is OK. -- To post to this group, send email to materials-welding@googlegroups.com To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com For more options, visit this group's bolg at http://materials-welding.blogspot.com/ http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm The views expressed/exchnaged in th...