To answer the query , you may refer below
For production weld PWHT, construction codes like ASME SEC I PW 39 . ASME sec VIII DIV 1 UCS 56 are referred.
The holding time at the specified temperature range is followed as a Minimum from respective Tables in the Codes .
15 - 20 minutes more than minimum specified is acceptable and no issue is envisaged
Vishwas Keskar
IWE
Sent from my iPhone
On 08-Dec-2023, at 11:24 PM, kumar sumit <kumarsumities@gmail.com> wrote:
Dear sir--In Pwht if soaking time period is increase(I.e- 15-20minute) at that time it is accepted or not. If accepted then how. If not accepted then also explain. Because I also search in sec IX but I cannot find.Please explain.I thankful to you.
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CACCHnjW3O9wLgzTBzRFZr78FLdCqgafkhxUKjyd3GSBQPsnZiQ%40mail.gmail.com.