Re: [MW:35723] PWHT after Hydro

 For main pressure welds on materials like P11, P91, and LTCS, PWHT is essential when prescribed, and the integrity test (hydro) 
must follow all heat treatments unless the code or a client-specific deviation allows. The code does not permit skipping a repeat hydro. 
The logic is that since PWHT can alter the microstructure and relieve stresses, it might reveal or create discontinuities that could 
compromise pressure integrity—meaning a follow-up hydro is generally required.

For P11 (1.25Cr-0.5Mo)
PWHT is mandatory for most thicknesses per ASME.
PWHT after the hydro test is typically acceptable, if permitted by project specs.
For P91 (9Cr-1Mo-V):
Highly sensitive to heat treatment cycles.
Incorrect PWHT can alter microstructure and reduce creep strength.
Often, clients require a hydro test after PWHT, especially in critical service.
LTCS:
Generally, more lenient.
PWHT after hydro test may be acceptable depending on the joint type ,thickness, and low temp. impact.

According to ASME B31.3, Clause 345.4.2, PWHT after hydro testing is allowed, and a repeat hydro test is NOT required if:

The system has not been opened or altered after the hydro test.

PWHT does not weaken or alter the pressure-retaining capacity of the system.

The PWHT is part of the planned fabrication sequence, and the test pressure already applied exceeds the pressure that the 

system would experience at the elevated PWHT temperature.

However, some client specifications override this and may demand a re-hydrotest after PWHT, especially for P91, which is 

sensitive to microstructural changes. PWHT is not required at all for LTCS unless impact testing is required at a low temperature.

C Sridhar.

  


On Thu, 17 Jul 2025 at 16:10, Kannayeram Gnanapandithan <kgpandithan@gmail.com> wrote:
Dears
     Materials P11,P91 & LTCS.
  Is there any provision to perform PWHT after Hydrotest without having to repeat the Hydrotest again ?

THANKS & BEST REGARDS,
KG.PANDITHAN, BE, IWE,  CSWIP 3.1,
ISO 9712 Level 2 in VT,
ASNT-Level II in PT,MT,RT & UT,
LA ISO 9001-2015, ISO 3834, EN 15085, 
International Welding Engineer. 
CONSULTANT-WELDING & QUALITY
Mobile no: +919940739349

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/materials-welding/CAJzm4eO6c%2BFD26ucwQX--8gxLfqTEqT0Q168jPUb2xS%3DcPipqg%40mail.gmail.com.

--
https://materials-welding.blogspot.com/
https://www.linkedin.com/groups/122787
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To view this discussion visit https://groups.google.com/d/msgid/materials-welding/CAHo%3DYiiqNbmdb-4UQVr8QofPZ1XwX%2B9%2BVfkDTE9mu4qVgpQDQg%40mail.gmail.com.

Comments

Popular posts from this blog

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...

Re: [MW:10788] ON PLOT PIPING & OFF PLOT PIPING

Piping systems involved for the flow lines and gathering lines from the well head isolation valve to the production facility or processing plant isolation valve are determined as OFF PLOT. ON PLOT defines piping system in the processing plant and production platform. ANSI/ASME B31.4 applies for off plot piping system. B31.4 allows the use of either API 1104 or ASME section IX (as appropriate). However, occasionally, a very small system such as piping within 500 feet of a processing plant (some client also said 400 feet) may be declared B31.3 rather than B31.4. When B31.3 is invoked, only ASME Section IX is used. before you decide which code to use for welding procedure and/or welder qualification for pipe welding, you have to know the design and construction code applicable to the system. Please read far enough into scope and diagram illustrating the application of either B31.3 and B31.4 hope this helps rgds 2011/4/21 pradip kumar sil < pradipsil@gmail.com > Dear all, ...