[MW:26229] Minimum diameter two welders can be engaged at one time

Dear Experts,

   In our project we have diameters from 2" to 8" thickness range of 5mm to 15mm and construction code is ASME V31.3 / 31.4 / 31.8

  Our construction is engaging two SMAW welders at one time in 4" and 6" diameter pipes for more production.

  As per code what is the minimum diameter restriction where two welders can be engaged at one time.

  What will be the effect on weldment if we engage two welders at one time.

Regards

R. Kandula

--
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/07ff8c14-2df1-4229-9d1a-071e3cdb5fd4%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

No comments:

Re: [MW:34874] ASME IX, groove weld during WQT limits for Fillet Weld production

Hi David,  There are two points in WQT. 1. Thickness of Base Metal -T 2. Thickness of Weld Metal -t When you use a combination of two proces...