Re: [MW:26048] Towice the PWHT for the same weld joints

Establish a repair welding procedure by running a PQR with double PWHT cycle. This can regularise the thing and convince your inspector. 

On Feb 11, 2017 7:09 PM, "Karthikeyan Muthuvel" <m.karthick2020@gmail.com> wrote:

Dear Experts,


Good day.


Regarding the mentioned subject, we have done PWHT for 2" SCH XS socket joint caustic line. Job was in service piping based on MOC there was heat treatment requirement.


Now problem is that during PWHT cycle due to the power breakdown cycle was uncompleted.  Temperature were reached up to 610°C job was interrupted before starting the holding time.


As per that particular shift Inspector's instruction job was restarted form 150°C and completed the job.


The next shift inspector is rejecting the job and asking to replace those particular fittings (elbows).


According to the above details, Please clarify is it acceptable multiple times of PWHT in the same weld joint or the fittings should be changed.


I hope that I have given enough details and looking for your valuable replies.


Thanks & Warm Regards,

KARTHIKEYAN  M.
Mobile:+966-501176985,
P Save A Tree - Please do not print unless really need

--
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAL7K%3D_%2Bh%3DDFVC4OkDvq6k9XYJqU0fakDRppSnzrw2oko_UWSqg%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.

--
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
To post to this group, send email to materials-welding@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/materials-welding/CAFHBd_9VFYiB5ND45dnn5akzGcWd3%3D6F-5-bBO%3DLeOh5PJVobw%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.

No comments:

[MW:34820] RE: 34813] Clarification in Rate of heating and cooling.

Hello,   Please see the response below.   Regards.   P. Goswami, P. Eng, IWE.   From: materials-welding@googlegroups.com <materials-weld...