Re: [MW:18867] PWHT Requirement for dissimilar welding b/w P91 & SS304


Sa335 Gr P91 side to be buttered up to a minimum of 13mm with ERNiCr-3. Then PWHT to be done for that side as per the requirement of P91 to P91 welding (Normally 720 deg temperature up to a minimim of 2hrs). Then face prepration is to be done (Ensure a 13mm buttering after this face prepration)

Then prepare the joint b/w P91 and SS304 and weld with ERNiCr-3

No PWHT requirements after this




On Sun, Oct 6, 2013 at 2:05 AM, Octane Mac <octane.mac@gmail.com> wrote:
B31.3: 704-760 C, minimum holding time 2 hrs. Holding time 1hr/in.
B31.1: 730-775 C, minimum holding time 30 minutes. Holding time 1hr/in. Note: As it is a dissimilar material welding and a nickel based consumable is recommended therefore minimum holding temperature shall be 700 C.

Octane



On Fri, Oct 4, 2013 at 7:33 PM, Abhishek Rai <abhishekkrrai@gmail.com> wrote:
Dear Sir,

Please confirm the requirement of PWHT b/w welding of P91 & SS 304.the operating temperature of piping is 640 deg c .

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.



--
----------------------
Hareesh K V
+91-9447625012


--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.

No comments:

[MW:34866] Presentation for WPS ,PQR AND WPQ as per ASME Sec IX in power point

Dear Experts.        If anyone having presentation of WPS,PQR and WPQ  as per ASME  SEC.IX  in power point then please share . Regards Sanja...