[MW:17448] Weld Seam & drain point overlapping...


Dear Experts , 

Weldolet ( Drain point ) is overlapping Long  seam of 48 inch  90 deg LR Elbow .. 
Design pressure : 96  Bar
Design temp ( Max/Min) : 80/5 deg C
Hydrotest Pressure : 120 Bar 
NDT : 100 % RT , MPI 
Application : Subsea 
Service: Offshore Non Sour, Non Corrosive , HC Crude Blended Oil 
Spec : ASME B 31.4 

Elbow Spec: ASTM A 860 WPHY 65 WLDD 

Kindly refer attached snap .. 

My Question is what should be the NDT to be performed before & after welding of weldolet ? please put code/client  reference .. ( Any ) 

( Kindly let me know if more information is required) 

Thanks & regards.  

ABHISHEK GHOSH 


 

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 

No comments:

[MW:34866] Presentation for WPS ,PQR AND WPQ as per ASME Sec IX in power point

Dear Experts.        If anyone having presentation of WPS,PQR and WPQ  as per ASME  SEC.IX  in power point then please share . Regards Sanja...