Guys,

    Exxon Mobil spec. states RT 10% of all socket welds on branch connections for complete fusion and gap.

 

When the welding is done you have to be able to slide a piece of paper or sharpened paper clip in the gap. If it’s bottomed out, it is a cut out.

 

A tacked socket joint should pull the full 1/16” during welding

 

Accept this comment as you like, but you need to confirm gap in most real world instances these days.

 

ONLY POSITIVE GAP. We’ve used small horoscopes with magnification and literally have shown the ExxonMobil (XOM) inspectors .005” gap to alleviate cut out.

 

If it is bottomed out it is identified as indeterminate whether gap was present in the joint prior to welding.

 

Ryan Carbonara

Welding / QA   

 


From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of John Henning
Sent: Monday, September 24, 2012 9:51 AM
To: materials-welding@googlegroups.com
Subject: RE: [MW:15380] Re: Socket weld gap requirement

 

The statement in Saudi Aramco Clause C2 is correct.

 

More often than not, the gap will “disappear” after welding.  The common misconception is that you must have the gap after welding.  The purpose of the gap is to permit shrinkage of the weld without creating additional mechanical stresses on the finished joint.  Obviously, in weldor parlance, if the joint “sucks in” the gap will close.

 

Note that at one time, the EPRI NDE center was doing some investigation into the necessity of gaping socket joints.  The opinion at that time was that the gap was unnecessary and that this “rule of thumb” was a nearly universal myth.  If memory serves me correctly, the recommendation was that a more important modification for socket joints was to make the length of the horizontal leg of the weld twice the length of the vertical leg.  This type modification was reportedly very effective especially in minimizing fatigue cracking.  I wouldn’t mind knowing if this has been investigated further or if there was any additional information published on this.

 

John A. Henning

Welding & Materials

 

From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of Pradeep kumar hormis
Sent: Monday, September 24, 2012 3:14 AM
To: materials-welding@googlegroups.com
Subject: Re: [MW:15378] Re: Socket weld gap requirement

 

Dear All

I would like to introduce my self first. I am working as QC WELDING INSPECTOR for one of SAUDI ARAMCO project. we are using most of socket joints for plant piping . SAUDI ARAMCO  having special standards , procedures and check lists for all the cases. so here i attached one of the check list for socket joints fit ups. even it is a client specification , I hope you will get help for your clarification. please note the CLAUSE -C2  on the SAIC.

On Sun, Sep 23, 2012 at 7:20 PM, Hernan Arturo Castillo Mier <Hernan.Castillo@ecopetrol.com.co> wrote:

Your information is not true.
The gap its necessary for thermal expansion of tube been welded according to the operation temperature.
Its necessary to calculate the expansion expected according to the op temp.



Enviado desde mi iPhone

El 23/09/2012, a las 10:28 a.m., "ranendrac6@gmail.com" <ranendrac6@gmail.com> escribió:


> The gap is required to release the fume gases which generated during welding. No gap required after welding(I don't see any reason).  You can check with 4 mm gap during fit up to meet client requirement.
> Sent on my BlackBerry® from Vodafone
>
> -----Original Message-----
> From: Raghuram Bathula <raghurambathula@gmail.com>
> Sender: materials-welding@googlegroups.com
> Date: Sun, 23 Sep 2012 08:10:03
> To: Materials & Welding<materials-welding@googlegroups.com>
> Reply-To: materials-welding@googlegroups.com
> Subject: [MW:15368] Re: Socket weld gap requirement
>
> no it it not required after welding, many times gap closes to zero due
> to shrinkage during welding. if your client requires the gap after
> welding (I don't see any reason for this) probably you need fit up
> with more gap.
>
> On Sep 22, 7:49 pm, Naresh Kumar <snareshkuma...@yahoo.com> wrote:
>> Dear experts,
>>
>> As per ASME 3.1.& 31.3 socket weld gap requirement is
>> 1/16” before welding. Whether it is required for after welding, if its require
>> kindly provide the code details.In our project we're done RT for socket welds. But
>> after welding did not find the 1/16” gap,
>> its less than 0.5mm. Our client decision is to cut and reweld the all joints.
>>
>>
>> Thanks & Regards,
>> Naresh
>
> --
> To post to this group, send email to materials-welding@googlegroups.com
> To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
> For more options, visit this group's bolg at http://materials-welding.blogspot.com/
> http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
>
> The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
>
>
> --
> To post to this group, send email to materials-welding@googlegroups.com
> To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
> For more options, visit this group's bolg at http://materials-welding.blogspot.com/
> http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
>
> The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
>
>
>

Este mensaje y sus anexos está dirigido para ser usado por su(s) destinatario(s) exclusivamente y puede contener información confidencial y/o reservada protegida legalmente. Si usted no es el destinatario, se le notifica que cualquier distribución o reproducción del mismo, o de cualquiera de sus anexos, está estrictamente prohibida. Si usted ha recibido este mensaje por error, por favor notifíquenos inmediatamente y elimine su texto original, incluidos los anexos, o destruya cualquier reproducción del mismo. Las opiniones expresadas en este mensaje son responsabilidad exclusiva de quien las emite y no necesariamente reflejan la posición institucional de Ecopetrol S.A. ni comprometen la responsabilidad institucional por el uso que el destinatario haga de las mismas. Este mensaje ha sido verificado con software antivirus. En consecuencia, Ecopetrol S.A. no se hace responsable por la presencia en él, o en sus anexos, de algún virus que pueda generar daños en los equipos o programas del destinatario.

This e-mail, and any attachments thereto, is intended for use by the addressee(s) named herein only and may contain legally privileged and/or confidential information. If you are not the recipient of this e-mail, you are hereby notified that any distribution or copying of this e-mail, and any attachments thereto, is strictly prohibited. If you have received this e-mail in error, please notify us immediately, permanently delete the original including attachments, and destroy any copy or printout thereof. The opinions contained in this message are the sole responsibility of the individual person who gives them and do not either necessarily reflect the institutional policy of Ecopetrol S.A. on the subject, or involve corporate responsibility for any use of them by the addressee(s). This message has been checked with antivirus software; therefore, Ecopetrol S.A. is not liable for the presence of any virus in the message or in its attachments that causes or may cause damage to the recipient's equipment or software.


--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm

The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.




--

Thanks & Regards

PRADEEPKUMAR HORMIS
QC WELDING INSPECTOR
ARAMCO PROJECT(JEDDAH REFINERY)
Mob:+966 - 59 11 36 36 9

 

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
 
 


______________________________________________________________________
The information in this email is confidential, and is intended solely for the addressee(s). If you are not the intended recipient of this email please let us know by reply and then delete it from your system; you should not copy this message or disclose its contents to anyone. The internet can not guarantee the integrity of this message. HAMON (and its subsidiaries) shall (will) not therefore be liable for the message if modified.
______________________________________________________________________

No comments:

[MW:34820] RE: 34813] Clarification in Rate of heating and cooling.

Hello,   Please see the response below.   Regards.   P. Goswami, P. Eng, IWE.   From: materials-welding@googlegroups.com <materials-weld...