Good day dear experts
I have trouble understanding the meaning of "major repair " as per API 653. 3.23
We have done some tank bottom repair work on a fuel tank as per API 653. We had to cut an envelope into the tank shell (300mm x 2000mm) to get the repair plates into the tank. Is it a requirement as per API 653 to carry out a hydrostatic stand test.
The envelope is cut out of the "critical zone" area and no repairs were done on the tank floor within the 'critical zone'. Does the envelope constitute a major repair?
Your advice would be greatly appreciated.
Best regards
RIAAN STOLTZ
RITC INSPECTION
083 640 5909
021 556 4884 (TEL)
021 556 6941 (FAX)
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
No comments:
Post a Comment