Wednesday, May 9, 2012

Re: [MW:14230] RE: 14158] RE: 14154] PWHT OF P 91 ALLOY STEEL MATERIAL.

ya, John Henning is right!!
do not worry about the extended storage time as long as you finish all the heat treatment progress.
WPS, FYI
 
PS: Boehler-Thyssen is the expert in welding WB36, P91, P92, P23/24, S-304.
 
 
Roy from Boehler Welding
 
From: pgoswami
Sent: Wednesday, May 02, 2012 10:32 AM
Subject: [MW:14167] RE: 14158] RE: 14154] PWHT OF P 91 ALLOY STEEL MATERIAL.
 
Hi Manoj,
 
SCC of P-91 welds , left without PWHT for 7 days could be a real issue. The whole scenario is very clearly explained by John Henning. Please see the attachment along with the full paper below. SCC could be a function of as welded hardness, ambient temperature over 40 Deg C or more and uncontrolled humidity and the contaminants in the environments.
 
It may be worth while to discuss this issue with your client. EPRI has quite a few good guidelines on this alloy. Those documents could definitely be a source of good fabrication practices.
 
Thanks,
 

Pradip Goswami,P.Eng.IWE

Welding & Metallurgical Specialist & Consultant

Ontario, Canada.

blocked::mailto:Email-pgoswami@sympatico.ca,

blocked::mailto:pgoswami@quickclic.net

 
www.vgb.org/en/event_mqa_pres.html?dfid=23397Similar

From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of John Henning
Sent: Friday, April 27, 2012 10:42 AM
To: materials-welding@googlegroups.com
Subject: [MW:14158] RE: 14154] PWHT OF P 91 ALLOY STEEL MATERIAL.

Stress corrosion cracking has been noted in as welded 91 material when it has been wetted.  The concern is that the welds may have dew formation, or in some way be exposed to water.  91 in the as welded condition should be held indoors in temperature and/ humidity controlled conditions.  An alternative is to keep in indoor storage but with the welded material maintained at a temperature above the expected dew point (by electric resistance pads most likely).  The seven day thing is bit arbitrary and my personal take is that it is just to make sure that PWHT is performed in a timely manner.  My experience with large amounts of welded 91 is that there has been no cracking even after extended time (a couple of months)  in the as welded condition but we hold all as welded 91 in climate controlled conditions.  I have not seen any empirical evidence that 7 days, 14 days, or 30 days makes any difference provided storage conditions are appropriate.

 

Note that function of the preheating and post heating you are doing is to prevent hydrogen assisted cracking.  The preheat and post heat allow hydrogen to diffuse out of the material.  Entirely different worry than SCC in the presence of water. 

 

Also note that any water; pure or otherwise has been demonstrated to allow SCC in as welded 91 and it only needs be a film of water.

 

John A. Henning

Welding & Materials

 

From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of manoj john
Sent: Thursday, April 26, 2012 3:24 AM
To: materials-welding@googlegroups.com
Subject: [MW:14154] PWHT OF P 91 ALLOY STEEL MATERIAL.

 

Dear All,

 

We are going to do P91 piping fabrication,   as per client specification the stroage time after welding is limited to maximum 7 days for PWHT.  Is there any problem if it delays 10 days when  we are  following preheating procedure for welding as mentioned below:

 

Preheat at 200 degree C.  Min. 300 degree C. Max.

Inter pass temperature  250  to 300 degree C.

Cooling 20  to 80 degree C. after wleding

Post heating (extended heating) after cooling 300 degree C.   

for four hours or 400 degree C. for three hours.

 

Thanks in advance for your response.\

 

Manoj.

 

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.


______________________________________________________________________
The information in this email is confidential, and is intended solely for the addressee(s). If you are not the intended recipient of this email please let us know by reply and then delete it from your system; you should not copy this message or disclose its contents to anyone. The internet can not guarantee the integrity of this message. HAMON (and its subsidiaries) shall (will) not therefore be liable for the message if modified.
______________________________________________________________________
--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

[MW:34820] RE: 34813] Clarification in Rate of heating and cooling.

Hello,   Please see the response below.   Regards.   P. Goswami, P. Eng, IWE.   From: materials-welding@googlegroups.com <materials-weld...