[MW:11850] RE: 11848] POST WELD HEAT TREATEMENT OF API 2W GR 50/API 2MT1 PIPES WITH THK 3''

Phillip,
 
API-RP 2A-WSD-Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms—Working Stress Design and  AWS D-1.1 have restrictions for PWHT on the above steels.
 
In addition the spec for base metal, API -2W -2000, have the following precautionary note for such(TMCP) steels:-
  • 1.2 POST MANUFACTURING HEATING

     Due to the inherent characteristics of the TMCP method, plates manufactured to this spec cannot be formed or post weld heat treated at temperatures above 1100°F (595°C) without some risk of sustaining irreversible and significant losses in strength and toughness. If warm-forming is to be required during subsequent fabrication, the tensile and notch toughness properties of the finished component shall be verified and the properties shall conform to the requirements of this specification. The procedure for verification shall be subject to mutual agreement. The plates may be post-weld heat treated at elevated temperatures not exceeding 1100°F (595°C) providing test coupons are subjected to a thermal cycle to stimulate such fabrication operations, as described in S9. Verification or simulation is not necessary for heating at temperatures not exceeding 400°F (205°C).

 
For a thickness of 3" if the design/ service conditions calls for PWHT, I would think the best option would be carry out  through the Simulated Heat Treatment ,see the base metal properties, and then to decide PWHT.
 
What're  the code or specifications for design and construction???
 
Thanks.
 
 
 
Pradip Goswami,P.Eng.IWE
Welding & Metallurgical Specialist & Consultant
Ontario,Canada.
Email-pgoswami@sympatico.ca,
 


From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of Philip, Taiye (Lagos)
Sent: Thursday, July 21, 2011 8:08 AM
To: materials-welding@googlegroups.com
Subject: [MW:11848] POST WELD HEAT TREATEMENT OF API 2W GR 50/API 2MT1 PIPES WITH THK 3''

Hello Gents,

Using AWS D1.1 as project code, is it wise/Professional to carry out

PWHT on joints made from (TMCP PLATES- API 2W Gr 50/ API 2MT1 Gr 50 rolled into pipes with thickness 3'')

Used for TKY joints on jackets.

Note: TMCP - thermo-mechanical control process.

Regards

Philip Taiye

Principal QA/QC Welding Engineer

(EPCM-1 Quality Assurance/Control)

DeltaAfrik Engineering Limited

2nd Floor, City Express Bank Building

Plot 1637 Adetokunbo Ademola Street

Victoria Island, Lagos  Nigeria

Phone: +234-1-461-8508, +2341-461-6137 ext. 1257
Cell: +234-(0)-803-803-1396
Fax: +234-1-262-2418

e-mail: taiye.philip@worleyparsons.com

 

 


*** WORLEYPARSONS GROUP NOTICE *** "This email is confidential. If you are not the intended recipient, you must not disclose or use the information contained in it. If you have received this email in error, please notify us immediately by return email and delete the email and any attachments. Any personal views or opinions expressed by the writer may not necessarily reflect the views or opinions of any company in the WorleyParsons Group of Companies."

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

Comments

Popular posts from this blog

Re: [MW:34105] SA266 GR4N 4 Cycle SPWHT

Hi,  You are correct, Minimum refers to the one cycle for which this part will expose until final work shop PWHT. hence mill test certificate shall include this.  Max. SPWHT, refers to additional cycles of heat treatment that are reserved for future repairs during equipment lifetime.  Again, these simulated no. Of cycles shall be specified in MTC.  The idea is we need to make sure that steel mechanical properties are not compromised upon exposure to multiple repairs (i e 4 cycles in your case).  One could say, if steel is subjected to 4 cycles and is ok, then it should by defacto be good for one cycle, yet, this is wrong assumption cause mechanical problems and microstructure of materials varies accordingly based on no. Of cycles for which material will expose. This is apparent in alloy steel and especially for impact test values as an example.  In your case, this forged CS with properties before PWHT can be understood to be " as forged" condition (i.e. Wit...

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...